NEA 2026 Winners

CENERGI FJP- MALAYSIA'S BIGGEST POME-TO-BIOGAS PLANT INTEGRATING SUSTAINABLE PRACTICES WITH ENGINEERING IMPACT

Winner
Category 3: Renewable Energy >
On-Grid (National)
  1. Generated over 29,140 MWh of renewable electricity through a 1.5 MW biogas plant utilising gas from POME
  2. Captured greenhouse gases from industrial wastewater and integrated rainwater harvesting for plant operations